Selected engineering experience

From drawings to decisions.

A portfolio of structural design, BIM development, quantity take-offs and tender support. The examples below explain the context, my role, the working process and the type of deliverable—not only the final image.

Spain · Structural design · Pit lane

Karting complex expansion

Structural development for the pit-lane area of a motorsport complex near Madrid. The assignment combined steel framing and reinforced-concrete components across buildings serving the operational edge of the track.

RoleStructural analysis and design support
SystemSteel frames + concrete elements
ToolsRAM Elements + technical drawings
BasisEurocode and Spanish CTE

The engineering task

The pit-lane structures required an efficient framing arrangement compatible with long open edges, circulation and the architectural use of the buildings. The work included interpretation of geometry, load definition, analytical modelling, member verification and coordination between structural systems.

What was developed

  • Primary framing and roof systems for the pit-lane buildings.
  • Steel-column and beam layouts responding to the functional bays.
  • Review of stability, serviceability and practical member arrangement.
  • Structural information coordinated with the drawing package.
Open the complete case study
Three-dimensional structural models for the karting pit-lane complex
Structural model views used to understand the complete pit-lane building configuration.
Spain · Preliminary design concept

Transportable modular housing

A preliminary modular-housing concept conceived so that individual units could be fabricated and transported separately, then assembled and combined on site in one-, two- or three-level arrangements.

Project stage: this was a preliminary design and feasibility concept. Detailed structural analysis, final member sizing, connection engineering and code verification remained necessary before construction.
Preliminary visualization of transportable modular homes in Spain
Concept visualization showing independent modules and a possible stacked arrangement.

Design intent

The system explored a repeatable module sized for transport, workshop fabrication and rapid assembly. A consistent steel vocabulary was proposed so the units could work independently or be connected vertically and horizontally at the destination.

Preliminary considerations

  • Transport envelope and independent handling of each module.
  • HSS frames, secondary floor members and defined connection zones.
  • Stacking logic and external circulation for multi-level configurations.
  • Interfaces for enclosure, services, green roofs and photovoltaic panels.
Open the complete case study
BIM + Architectural development · Collaborative work

Aircraft hangar

Architectural design development and BIM production for an aircraft hangar, completed in coordination with an architect. The work translated the design intent into a coordinated model, exterior studies, interior circulation and presentation views.

ContributionBIM modelling and documentation
CollaborationDeveloped with an architect
ScopeExterior, interior and spatial coordination
OutputModel views and architectural information

Coordination focus

The BIM work was used to test the scale of the main volume, façade composition, openings, support rooms, mezzanine edges and visual relationships inside the hangar. Authorship is presented accurately: the result was collaborative, combining architectural direction with BIM development and technical production.

Current specialty · Multidisciplinary estimating

Quantity take-offs & tender support

A broader body of work covering drawing-package review, scope definition and traceable quantities for pricing and tender preparation. Depending on the assignment, the take-off may cover a complete project or a focused discipline.

01 · Intake

Review folders, drawings, specifications, revisions and available schedules.

02 · Scope

Define included trades, measurement rules, assumptions and missing information.

03 · Quantify

Measure and classify items with references to the source documentation.

04 · Tender output

Organize BOQs, budgets, clarifications and review-ready worksheets.

Typical scopes

  • Architectural quantities for new buildings and renovations.
  • Structural concrete, reinforcement and structural-steel packages.
  • Remodeling and repair work with demolition and replacement items.
  • Fire-alarm and other specialist systems when specifically requested.
  • Trade-by-trade BOQs supporting contractor pricing and procurement.

The emphasis is not only on producing a number. It is on creating a traceable basis for estimating, identifying gaps early and making the tender package easier to review.

Fire-alarm floor plan reviewed for a specialist quantity take-off
Specialist systems can be isolated and quantified when the tender scope requires it.
Puerto Rico · 6+ month collaboration

Vasquez Holding — housing renovation tenders

Ongoing support for a Puerto Rico company preparing bids for residential renovation and repair programs. The assignments converted existing and proposed drawings into coordinated tender information.

DurationMore than six months
MarketPuerto Rico
Project typeHousing repair and renovation
SupportTake-off, budget and schedule

Typical workflow

The company provided the plans and tender information. My role was to review the documentation, identify repair and replacement work, quantify the architectural scope, organize the estimate and contribute to the construction schedule required for the bid.

  • Review of existing, demolition and proposed information.
  • Quantification of repairs, replacements and architectural work.
  • Budget organization aligned with the tender scope.
  • Construction-sequence and schedule support.
  • Clarifications and assumptions for internal bid review.
Demolition plans for accessible housing renovation in Puerto Rico
Representative demolition and renovation plans used to identify the work required in different dwelling types.
Australia · 1 year collaboration · Structural steel

STE Engineering — steel estimating packages

Long-term estimating support for Australian structural-steel tenders across hospitals, schools, warehouses, housing and other building types. The work transforms structural documentation into a complete, reviewable steel package.

01 · Drawing review

Classify structural drawings, specifications, schedules, revisions and scope gaps.

02 · Steel take-off

Quantify members, plates, connections, bolts and miscellaneous steel by profile and treatment.

03 · Estimate

Organize painted and galvanized scope, fabrication activities, freight and pricing inputs.

04 · Handover

Prepare a concise package with assumptions, summaries and reviewable supporting detail.

What the package can include

  • Member schedules and full profile grouping.
  • Plates, connections, bolts and miscellaneous items.
  • Surface-treatment classification.
  • Fabrication, erection and activity breakdowns.
  • Budget summaries and freight considerations.
  • Assumptions, exclusions and tender questions.

Why this experience matters

Working repeatedly with different Australian building types has strengthened a systematic approach to document intake, revision control, traceability and tender risk. The objective is a package that another estimator or engineer can review—not an isolated total.

Discuss steel estimating on Upwork
Singapore + Mexico · Structural engineering

Photovoltaic support structures

Two related assignments: verification of an existing industrial roof for added photovoltaic loads and preliminary design of a modular steel support frame considering gravity, wind, stability and practical assembly.

Open the complete case study
International engineering support

Need a traceable estimate, model or technical package?

Review my verified work history and start a defined contract through Upwork.

View Diego on Upwork
Hire me on Upwork →
Scroll al inicio